Roof leaking
The roof is leaking in kits area next to the laser printer.
Remove A/C from office wall and patch hole.
Remove A/C from office wall and patch hole.
daewoo
keeps dying
Over Head Door to adjoining Warehouse
The automatic gear is not functioning, but the door can still be raised manually. A gear has fallen off, as shown in the attached picture, presenting a safety concern. Employees have been instructed not to use the door until further notice.
Spray Dryer Instrument and Controls Upgrade
Gather information and look into options for upgrading and replacing obsolete instruments and controls on the spray dry system.
hole in rt3
hole in rt3 needs replaced Action Item A
Add key pads to all points of entry
From: Phil Engel engelp@fair-rite.com Sent: Wednesday, July 16, 2025 8:32:15 AM To: amason@fieldwrxs.com amason@fieldwrxs.com Cc: Stuart Matthews matthewss@fair-rite.com; Eric Drozenski drozenskie@fair-rite.com Subject: Re: Access Contr…
zone 2 on RT2 and RT3 did not operate properly
during a routine operations check or our rotary calcine tubes it was discovered that zone 2 on both kilns were not operating properly. further investigation and diagnostics is needed
repair sandpiper pumps
Repair all sandpiper pumps that do not operate properly or not at all. In the attachments there is a quote for all the parts to do a complete rebuild of a sandpiper pump. we have some parts but not all that are required to do a complete…
Roof leak in main ware house
Unit by Kits
Paddle Switch on Diverter on the Feed Hopper
The paddle switch on the diverter should operate automatically. Currently, it is being run manually. We need to repair it to restore automatic functionality.
Guttering needs repaired
Seamless Guttering was on site. They will be able to use their own equipment for the job. Verbal quote of $1200 Job is pending dry land and W-9 and COI
Verify inventory of 0PRIRAMH10
This is a reminder to inspect the inventory of 0PRIRAMH10. Once inventory has run out, an ECN needs to be submitted to change the part number 0PRIRAMH10 to 0PRIRHHFSB in all places that high grade iron is used/ referenced. **See attached…
recharge a/c unit in main warehouse
a/c unit needs recharged
The light for the flagpole is staying on all the time
The light for the flagpole is staying on all the time.
cut inspection window in hopper
Inspection window needs cut in hopper to make it more convenient for use
Order OEM backup alarm
Axle/ Tie Rod Ends
Tube Heater in A isle only heating 80 percent
Investigate the tube heater in A aisle, as it is only heating to 80% capacity.
plumbing leak in coolant filter valve
valve is leaking in front of the ball mill coolant filters
Replace dash on electric fork truck.
Replace dash on electric fork truck.
Asphalt needs sealed
Replace equipment outline tape
PM Schedule needed for Batching System, Augers, Motors, Drives Etc.
PM Schedule needed for Batching System to hopefully catch potential problems before they occur, and to keep machinery operating efficiently
Repair Windows on House
C item
Repair Sliding Door in Building 5
The door tracking needs to be repaired and may require replacement, as the door is currently off its tracks. Additionally, the drip edge (the protective lip that prevents water from entering) is damaged and should be inspected for repair or…
Install lighting and outlets in Facilities Maintenance Building
Install lighting and outlets in Facilities Maintenance Building
Adjoining Warehouse Replacement
Adjoining Warehouse Replacement Checklist for contractor walkthroughs (3 quotes required): • Provide a quote to replace the existing wooden structure with a new all-metal building • Assess condition of the existing concrete floor and woo…
Add exhaust to Facilities Maintenance Building
Add exhaust to Facilities Maintenance Building
Install Breaker Box In Facilities Maintenance Building
Install Breaker Box In Facilities Maintenance Building
look at to move the cardboard crusher
check to see what it will take to move the cardboard crusher.
Clean office window
Window on Phil’s office needs cleaned.
Mill Motor Quote for Reference
At this time we do not need to proceed with this purchase. This quote is for reference
Tube heater powder
Need a replacement tube heater in powder
Need a replacement tube
Need a replacement tube for tube heater in main warehouse
there are a couple lights that need to be changed over for LED
there are a couple lights in the raw room that need to be changed over to support the LED bulbs
replace 1" meter base
1" meter base is leaking when in operation. meter base is already in stock will have to replumb to fit new base
carts for sandpiper pumps
build or modify carts for sandpiper pumps. With carts that the pumps fit on properly it will be efficient for hook up, usage, and cleaning.
Move Tube Heater from old generator room tofacilities maintenance building
Purchase Tube Heater for facilities maintenance building
tear down garage next to the old house
the garage next to the old house is falling apart and needs to be torn down.